Pool Care Blog
New Home Pool Startup in Fort Bend County: Complete Guide
Just moved into a new build in Sienna, Riverstone, or Aliana with a fresh pool? Here's the critical first 30 days of pool care that builders don't tell you about.
The 30 Days Your Builder Doesn't Cover
The pool looks finished the day you close. Chemically, it's brand new — fresh plaster is curing underwater for the next month, releasing plaster dust and pushing pH up daily. How those first 30 days are handled determines whether your finish lasts 15 years or starts mottling in year two.
Builders hand over a beautiful pool and a one-page care sheet. Here's what should actually happen, week by week.
Days 1–7: The Critical Week
- Brush the entire pool twice a day. Curing plaster sheds dust that must be brushed into suspension so the filter can catch it. Skipping this is how new pools end up with rough, gray-streaked surfaces.
- Run the pump 24 hours a day for the first week. Circulation is everything while plaster dust is in the water.
- Test pH daily. Curing plaster drives pH up hard — expect to add acid more often than you ever will again. Fort Bend's high-alkalinity fill water (here's why) makes the drift even stronger.
- No salt yet. If you have a salt system, wait 30 days. Salt added to uncured plaster stains and shortens finish life — run liquid chlorine for the first month.
- Stay out of the water until chemistry is balanced and the builder or startup tech clears it.
Days 8–14: Settling In
- Brushing drops to once daily
- Pump runtime drops to 10–12 hours
- Test chemistry every other day — pH still drifts, just slower
- Clean the filter at the end of week two; it's been eating plaster dust and will read high pressure
Days 15–30: Building the Routine
- Brush every other day, test twice a week
- Dial in CYA (stabilizer) — new fills start at zero, which means chlorine burns off in hours of Texas sun until conditioner is added. (What CYA is and why it matters.)
- Day 30: salt system can come online; chemistry moves to a normal weekly cadence
Fort Bend-Specific Watch Items
Clay settling around a new pad. New construction means recently disturbed soil. Watch the equipment pad through the first year — Fort Bend clay settles, and a tilting pad stresses pump seals and plumbing.
Builder warranty documentation. Photograph the finish in the first week and keep chemistry logs. If plaster issues surface later, documented startup care is what keeps a warranty conversation easy.
HOA timing. In Sienna, Riverstone, and Aliana, pool appearance expectations apply from day one — a green new pool gets the same letter an old one does.
Doing It Yourself vs. Handing It Off
A proper startup is roughly 20 hours of work in the first month, with daily attention in week one. Some homeowners enjoy it. Most new-build owners are also unpacking a house.
We run new-pool startups across Fort Bend: daily week-one visits, full chemistry management, filter cleaning, salt conversion at day 30, and documentation for your builder warranty — then a seamless handoff to weekly service.
Get your startup quote or call (281) 624-6191 — ideally before the pool is filled.
Or call (281) 624-6191.
More from the Admiral pool care blog · RAIL-licensed · serving Greater Houston since 2019.